恒通商务园B29项目开始施工

Construction of Hengtong Business Park B29 Project Started

Jan. 2019

南侧沿街 / South Street View

南侧沿街 / South Street View

极限成本的问题 / The ultimate cost problem

由于本项目成本及其有限,所以所有的设计都只能非常谨慎与“恰到好处”。完全不改变原有结构与门窗洞口大小的情况下,只做入口的调整,让整个项目看上去像一个整体。

Due to the extremely limited cost of the project, all the designs had to be very careful and "just right". Without changing the original structure and the size of the door and window openings, only the entrance is adjusted to make the whole project look like a whole.

位置 / Location

位置 / Location

西入口 / West Entrance

西入口 / West Entrance

西侧平台 / Platform in West Side

西侧平台 / Platform in West Side